Alteration 08 Jabiru 3300 |
|
||||||||||||
Page 08.01 Bottom Mount |
NOTE: Any alteration will require it to be registered as Experimental-Amateur Built E-AB | ||||||||||||
Parts
|
This Alteration is to add a Jab 3300 Additional Information will be shown in the appropriate section |
||||||||||||
This is to add to the support of the
bottom engine mounts. Step: 01 Make the left Tunnel Rib Doubler. Clamp, bolt and cleco a right F-1217A R Tunnel Rib to the Left Tunnel Rib, F-1272 Floor Skin, F-1201C Firewall Bottom & F-1202F Bulkhead. Drill the holes as you go. Add a row of #30 holes under the sloped flange Repeat for the right Tunnel Rib Doubler. 09/06/12 |
|||||||||||||
Step: 02 Drill #30 the
Nutplate four holes in the front bottom flange of the left and right
Tunnel Rid Doublers 09/17/12 |
|||||||||||||
Step: 03 Remove the
sloped flange from the left and Right Tunnel Rib Doublers 09/12/12 |
|||||||||||||
Step: 04 File the front
of the bottom flange of the F-1277A-L and R tunnel rib doublers as shown
to clear the rivet in the floor Skin. 09/07/12 |
|||||||||||||
Step: 05 The reason for
step 04 11/04/12 |
|||||||||||||
Step: 06 Rivet the
Tunnel ribs to the Floor Skin 10/14/12 |
|||||||||||||
Step: 07 | |||||||||||||
Step: 08 Make two engine mount reinforcement angles as shown. 4130 4130 STEEL SHEETS MIL-S-6345A NORMALIZED 10/22/12 |
|||||||||||||
Step: 09 Install engine
mount reinforcement angles as shown 11/03/12 |
|||||||||||||
Step: 10 Two rows of
rivets at each double tunnel rib. 11/04/12 |
|||||||||||||
Alteration 08.01 Jab 3300 |
|
|
|
||||||||||