![]() |
|||||||||||
|
|||||||||||
| Home | Alterations | Vendors | Builders Log | Home |
| Alteration 11 Brake System |
|
||||||||||||
| Page 11.01 - Brake Lines | NOTE: Any alteration will require it to be registered as Experimental-Amateur Built EAB | ||||||||||||
|
Parts
|
This Alteration is a modification of the Brake Lines, Parking Brake and Peddles |
||||||||||||
| Step: 01 Purchase 1/2"
R8 Collet and a 7/8X3/32" HS Convex Shank Type Cutter for my mill. Build custom clamping vice to hold the Landing Gear Leg. 6/22/13 |
![]() |
||||||||||||
| Step: 02 Cut 3/16" X
.140 Groove in trailing edge of Main Landing Gear. Test Fit with 3/16" Drill Bit. 06/29/13 |
![]() |
||||||||||||
| Step: 03 Test fit Brake
Line. 6/29/13 Builder Note: The brake line almost disappeared. |
![]() |
||||||||||||
| Step: 04 | |||||||||||||
| Step: 05 | |||||||||||||
| Step:06 | |||||||||||||
| Step: 07 | |||||||||||||
| Page 11.01 - Brake Lines |
|
| Flush Rivets | Stab Fairings | Static Air | Canopy Lock | Battery Location | Wing Tanks | Rear Windows | Engine | Seat Adjustment |
| Seat Brace | Brake System | Electric Flaps | Rudder Trim | Panel | Builders Log |
|
||||||||||
|
Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source. |