Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
Home Alterations Vendors Builders Log  Home
Alteration 11 Brake System
11.01 - Brake Lines 11.02 - Parking Brake 11.03 - Brake Peddles  
Page 11.01 - Brake Lines NOTE: Any alteration will require it to be registered as Experimental-Amateur Built  EAB
Parts
     
     
     

This Alteration is a modification of the Brake Lines, Parking Brake and Peddles

Step 01: Purchase 1/2" R8 collet and a 7/8X3/32" HS convex shank type cutter for my mill.

Build custom clamping vice to hold the landing gear leg.

6/22/13
Step 02: Cut 3/16" X .140 groove in trailing edge of Main Landing Gear.

Test fit with 3/16" drill bit.

06/29/13
Step 03: Test fit brake line.

6/29/13

Builder Note: The brake line almost disappeared.
   
Page 11.01 - Brake Lines
11.01 - Brake Lines 11.02 - Parking Brake 11.03 - Brake Peddles  
01: Flush Rivets 02: Stab Fairings 03: Static Air / Pitot 04: Canopy Lock / Lift  05: Battery Location 06: Fuel Tanks
07: Rear Windows 08: Engine 09: Seat Adjustment 10: Seat Brace 11: Brake System 12: Electric Flaps
13: Rudder Trim 14: Tailcone Fairing 15: Wing Skin Stiffeners 16: Wing Tip Lights 17: Rear Baggage 18: Tailcone Camera
19: Tailcone Stiffeners 20: Tie Down Rings 22: Vent Door Knobs      
           
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.