Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Page 09.08 Stabilator
9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10  
Step 01: Mark one of the HS-1201 Main Skins as HS_1201-R, That will be the right main skin. Mark the other main skin as HS1201-L, that will be the left main skin.

Step 02: Cleco the HS-1218A-L & R Aft Hinge to HS-1201-R Main Skin. Orient the hinges flush to the inside surface of the aft flange aligned to the hole pattern nearest to the bend of the aft flange as shown in Figure 1.

Step 03: Match-Drill #30 the holes at each masking tape location from the HS01201-R main Skin into the DS-1218A-L & R Aft Hinges. Match-Drill #30 the hole at the inboard end of both aft hinges.

Remove the aft hinges, deburr the holes and clear away any chips.

08/10/10
Step 04: Cleco the HS-1201-R & L Main skins to the Stabilator Skeleton Assembly as shown in Figure 2. Cleco all of the holes in the bottom side of one of the main skins. Guide the upper aft flange of the main skin to the outside of the lower aft flange. Then cleco all of the holes on the top side.
Complete Step 5 with the first main skin. Then repeat this step for the remaining main skin.
NOTE: Figure 3 calls out the rivets and locations for the HS-1201-R Main Skins. Rivets and locations for the left side main skin are a mirror of the right. The entire bottom side of the main skin is a mirror of the top side.

11/17/10

Builders Note: Builders Paper used to prevent marking primer.
Step 05: Rivet only the top and bottom surface of the HS-1201-R & L Main Skins to the Stabilator Skeleton Assembly per call-outs in Figure 3. Leave open the aft flanges of the main skins. Begin at the leading edge of the main skin and finish at the trailing edge. Leave open the aft outboard row of holes on the top and bottom, called out in Figure .
11/17/10

Alteration Rivets Used
Step 06: Rivet the remaining open holes in the top and bottom of the Stabilator Skeleton Assembly between the HS-1201-R & L Main Skins per callouts in Figure 3. Refer to the Stabilator Skeleton Assembly with the main skins attached as the Stabilator Assembly.

11/17/10
Page 09.08 Stabilator
9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10  
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.