Step 01: Select one of the aft trimmed W-1208-R Nose Ribs and rivet it to the W-1206-L Spar Assembly attach angle starting outboard and working inbord, this is now known as Nose Rib-L01.
Step 02: Select one more of the aft trimmed W-1208-R Nose Ribs and rivet it the next attach angle,
this is now known as Nose Rib-L02.
Step 03: Select three more of the aft trimmed W-1208-R Nose Ribs and rivet them to the next attach angles,
these are now known as Nose Ribs-L03, L04, and L05

Builder Note: Nose Rib L04 Will be modified in Step:
Step 04: Select one of the unmodifed W-1208-R Nose Ribs and rivet it to the W-1206-L Spar Assembly on the next attach angle and working inbord, this is now known as Nose Rib-L06. 
Step 05: Select the unmodifed W-1208-R Nose Ribs with the two nutplates attached and rivet it to the W-1206-L Spar Assembly on the next attach angle and working inbord, this is now known as Nose Rib-L07.    
Step 05: Select one unmodified and two forward aft trimmed W-1208-R Nose Ribs  and rivet them to the W-1206-L Spar Assembly on the next attach angles, these are now known as Nose Ribs -L08, L09 and L10. 

Builder Note: When installing  the ribs in front of the four fuel tank ribs add the spacer plates in the photo in Step: 05B on the back side of the spar.  
 
Step 05B: Install the spacer plates at the front of the four fuel tank ribs. These four ribs are not trimmed at the front. this is not per van's instructions.

Builder Note: I left the flanges on to help with the loads from the fuel tank. This requires longer rivets.
   
   
Step 06: Install the next three ribs in reverse order, these are now known as Nose Ribs -L11, L12 and L13. 

Builder Note: Install in reverse order will make the riveting easer.
Step 07: Install the last rib, this is now known as Nose Rib -L14.

Builder Note: The tray in Nose Ribs L12 and L13 is a backup for the GMU 24 Magnetometer. 
Step 08:  
Step 09: Remove and replace rivets in Nose Rib L04  
Step 10: Cleco then rivet the tray for the pirmary locataion of the GMU 24 Magnetometer.   
Step 11: Cleco then rivet the Left Stub Spar Assembly to the forward flanges the Nose Ribs as shown in Figure 1.  
Page 15.05 Wing Ribs
15.01 15.02 15.03 15.04 15.05 15.06 15.07 15.08      
SPAR ASSEMBLY REAR & STUB SPARS WING RIBS  STALL WARNING WING SKINS FLAPERON BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.