Page 32.02: FLIGHT CONTROLS
32.01 32.02 32.03 32.04 32.05 32.06 32.07 32.08 32.09 32.10  
32.11 32.12 31.13 32.14              
Alteration: To add reinforcement at the Brake Fluid Reservoir.
Alteration: Reinforcement Ring.
Alteration: Reinforcement Ring pressed on with a thin coat of JB Weld.

This will help to stop the thin wall left after taping from cracking when installing the brass fitting I will use in Step: 02.
Step 01: Bolt the VA-107 Brake Reservoir to the F-1201A Firewall upper using the hardware called out in Figure 1.
Make a tool to push the insert into the brake line and add a drop of brake fluid to help it to slide in.
Step 02:Secure the F-1289A- L & R Reservoir brake lines to the VA-107 Brake Reservor as shown in Figure 2. Loosen the Nylon Nuts, insert the reservor brake lines. push hard until they bottom-out in the Mail Nylon Tee, then tighten the Nylon Nuts. Use thread sealant for the connection between the Mail Nylon Tee and the brake reservoir.

Builder Note:
Step 03: Secure the F-1289A- L & R Reservoir Brake Lines and F-1289B- L & R Cross-Over Brake lines ( the four brake lines attached to the right side master cylinders ) to the bottom of the F-1202B Panel Base using the hardware called out in Figure 2.

Builder Note:
Step 04:  
   
 
32.01 32.02 32.03 32.04 32.05 32.06 32.07 32.08 32.09 32.10  
32.11 32.12 31.13 32.14              
CENTER SECTION MID FUSE LOWER FUSE  SIDE SKINS ROLLOVER TAIL ATTCH  SEATS PEDALS FUEL FWD FUSE  BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.