Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
RV12 N7944A OPEN Bulletin Log
All Bulletions

Vans Service Bulletins
Note: this aircraft is built EAB and has a Jabiru 3000 120hp Power Plant.
 The bulletins that are for the Rotax engine do not apply.
The Jabiru notices will be listed in the engine log
.
Builder Note: All service bulletins have been inspected as the aircraft was built and will be checked as required.
SB-00053
Tailcone Skin Clips
OPEN
Date
Date  
Required Action: Inspect lower tailcone skin for cracks and install new tailcone stiffener clips Time of Compliance: Within 100 hours or at the next 12-month inspection, whichever occurs first
SB_16-05-23B
Nose Fork
OPEN
Date 08/10/22
Date  
Inspect before further flight, then at 25-hour intervals, and replace at the next annual or 100-hour inspection
SB 19-08-26
Nose gear replacement
OPEN
Date
Date  
Required Action: Replace WD-1201 with WD-1201-1-RTR Nose Gear Time of Compliance: At or before the next annual condition inspection

An RV-12 training aircraft with more than 1700 hours of accumulated flight time recently experienced a nose gear fatigue failure. This is the only reported instance; no other fatigue-related nose gear failures have been reported.
SB 18-02-03
Anti - Servo Tab Cracks

Start on..... 00/00/00

Finished..00/00/00

OPEN
Date
Date  
Required Action: Inspect for cracks in the area around the aft rivet in both side flanges of the F-1206F Bearing Bracket Brace. See Figure 1. The presence of cracks requires the modifications described in this document. If no cracks are present, make a log book entry indicating compliance with this service bulletin and date of next inspection
SB-16-05-23
Nose Fork Inspection
OPEN
Date
Date  
A damaged nose fork was returned to Van's Aircraft for review. Upon inspection, the nose fork was discovered to have had a manufacturing defect. Parts at Van's Aircraft were also inspected and some were found to have a similar defect  ( will check on preflight )
SB 14-12-06
F-1206F Bearing Cracks
OPEN
Date
Date  
Inspect for cracks in the area around the aft rivet in both side flanges of the F-1206F Bearing Bracket Brace. See Figure 1. The presence of cracks requires the modifications described in this document. If no cracks are present, make a log book entry indicating compliance with this service bulletin and date of next inspection (if applicable).
SB 13-12-12
Sealing Avionics Bay
Open
Date
Date  
Avoid flight in precipitation prior to complying with this bulletin.  Without seal, water may infiltrate structure between mating surfaces of F-1240 Upper Forward Fuselage Skin and F-1201H Upper Fwd. Fuss
SB 10-12-14
Possible cracks on WD-1230
Superseded
SB-16-05-23
A damaged nose fork was returned to Van's Aircraft for review. Upon inspection, the nose fork was discovered to have had a manufacturing defect. Parts at Van's Aircraft were also inspected and Some were found to have a similar defect
     
RV-12 Safety Directives and Alerts
SD-00001 Open
Date
Date  
Inspect the trim motor shaft for straightness before further flight. Replace if bent or if trim unit time in service exceeds 1000 flight hours.