|
VERTICAL STAB | RUDDER | ANTI-SERVO TAB | STABILATOR | TAILCONE | EMP ATTACH | EMP FAIRINGS | BUILDERS LOG |
Page 06.05 Vertical Stabilizer |
|
|||||||||||
Step 01:
Radius the edges at the narrow end of the VS-1205 Tip Rib, the VS-1206
Mid Rib and the VS-1202 Front Spar as shown in Figure 1. A great way to cut the radius is with a fine file. 07-12-10 |
||||||||||||
Step 02: Flute ( Section
5N ) between the holes in the flanges of the VS-1202
Front Spar and any of the other vertical stabilizer ribs as necessary to
straighten the flange hole pattern. Builder Note: Straighten, deburr and hold for priming 07-12-10 |
||||||||||||
Step 02
A: ALTERATION Dimple with a 120° Dimple Die The Flanges of the VS-1202 Front Spar and all of the vertical stabilizer ribs Photo Note: Some of the Photos on this site will show the Alteration. 09/23/10 .2 Hrs. |
||||||||||||
Step 03: Rivet the VS-1202
Front Spar, the VS-1208 Lower Main Rib, and the nutplates together.
Orient rib flanges as shown in Figure 2. Flush rivet on the previously
countersunk side of the front spar. 09/27/10 |
||||||||||||
Step 04: Rivet the VS-1207
Upper Main Rib to the VS-1202 Front Spar. Hardware call-out and rib
flange orientation shown in Figure 2. 09/27/0 |
||||||||||||
NOTE: Rib flange orientation and hardware
call-outs for Step 5 through Step 8 are shown in figure 3. Step 05: Rivet the VS-1212-A-L & R Lower Spar Cap to the VS-1208 Rear Spar using the rivets called out. Place tape over the holes to be left open Builder Note: Alteration Rivets Used 09/27/10 T.2 |
||||||||||||
Step 06:
Rivet the VS-1207 Upper and VS-1208 Lower Main Rib to the VS-1203 Rear
Spar and VS-1212A-L & R Lower Spar Caps. 09/27/10 |
||||||||||||
Step 07:
Rivet the VS-1206 Mid Rib to the VS1203 Rear Spar. 09/27/10 |
||||||||||||
Step 08:
Rivet the VS-1205 Tip Rib To The VS-1203
Rear Spar. Refer to this Sub-assembly as the V-Stab Skeleton Assembly. 09/27/10 |
||||||||||||
Page 06.05 Vertical Stabilizer |
|
VERTICAL STAB | RUDDER | ANTI-SERVO TAB | STABILATOR | TAILCONE | EMP ATTACH | EMP FAIRINGS | BUILDERS LOG |
|
||||||||||
Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source. |