Page  27.03 Rudder Pedals & Brake System
27.01 27.02 27.03                
                     
Step 01: The holes are Match-Drilled #30 , #12 and finely 1/4"

Repeat for all four pedals.

See Figure 1.

11/11/12
Step 02: Install the Pedal assembly as outlined in Figure 4

11/12/12
See Alteration 11 Brake System  
   