Page 24.04 Rollover
Structure & F-1207 Bulkhead
|
|
Step 01: Cleco the
1207C-L & R Baggage Bulkheads to the Tailcone Assembly as shown in
Figure 1. |
|
Step 02: Mark a
centerline in the forward face of the F-1284-L & R Shear Clips. |
|
Step 03: Match-Drill
#30 the two holes from the F-1207C-L & R Baggage Bulkheads into the
corresponding F-1284-L & R Shear Clips as called out in Figure 1. Check
that the centerline drawn in step 2 is centered in the two holes before
match drilling. Remove the bulkheads, clean and deburr the holes |
|
|
|
|
|