Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Page 12.04 Emp Fairings
12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11
Step 01: Remove the Rudder Assembly From The V-Stab Assembly.  
Step 02: Rivet the VS-1213 V-Stab Tip Fairing to the V-Stab Assembly using the rivets called out in Figure 1.  
Step 03: Rivet the R-1206 Rudder Tip Fairing to the Rudder Assembly using the rivets called out in Figure 1.  
Note: For Step 4 refer to Page 11-02. Note: The completion of this section must be postponed until just prior to Section 32 since the F-1294A and F1294B are shipped in the Finish Kit.
Step 04: Install the V-Stab Assembly to the Tailcone Assembly.  
Page 12.04 Emp Fairings
12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.