Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Page 12.10 Emp Fairings
12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11
Step 01: Locate a nutplate, using a #6 screw, through one of the #27 fairing attach holes in the aft of the Tailcone Assembly. Bend the nutplate attach tabs as necessary to conform to the tailcone skins.  
Step 02: Match-Drill using an extended #40 one of the nutplate attach rivet holes into the Tailcone Assembly. Cleco that hole. Then match-drill #40 the remaining nutplate attach rivet hole. Mark the location of each nutplate.

Repeat Step 1 and 2 for all of the fairing attach nutplates.
 
Step 03: Tap the called out nutplates half way through the screw hole per call-out in figure 1.  
Step 04: Dimple, using a 3/32 die, the #40 nutplate attach rivet holes in the Tailcone Assembly per call-outs in Figure 1.  
Step 05: Dimple, using a3/32 die, the attach rivet holes in the nutplates called out in Figure 2.  
Step 06: Rivet the nutplates to the tailcone per marks made in Step 02, and call-outs in Figure 1.  
Step 07: Drill a 3/4 inch hole using a step drill bit within the scribe line at the bottom of the F-1294B Lower Tailcone Fairing as shown in Figure 3.  
Step 08: Install the Trim Servo Assembly, Refer to Section 11 Page 07 for attachment instructions.  
Step 09: Refer to Page 11-08 for temporary Trim Servo Assembly actuation instructions. Actuate the Trim Servo Assembly to be fully retracted.  
Step 10: Attach the F-1294A & B Upper and Lower Tailcone Fairings to the Tail Assembly.  
Step 11: Check the clearance between the Trim Servo Assembly and the F-1294A & B Upper and Lower Tailcone Fairing throughout the Stabilator Assembly travel as shown in Figure 4. If necessary, mark then trim the upper and lower tailcone fairings to provide at least 1/8 inch clearance for the Trim Servo Assembly.

Remove the upper and lower tailcone fairings.
 
Step 12: Repeat Step 08 through 10 with the Trim Servo Assembly fully extended.  
Page 12.10 Emp Fairings
12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.