45: Engine Install |
|
|||||||||
Page: 45.02 Engine Install | ||||||||||
01:
Received the motor mounts from Pete today in the mail. Phil and I installed the Jabiru Engine on the rubber mounts. 01/31/18 |
||||||||||
02: Reviewed
the Install and removed the engine hoist. 02/01/18 |
||||||||||
03: The
washer on the throttle shaft is larger then the bore in the Throttle
Extension Arm. The New Arm is not parallel to the stock arm with this problem. 02/02/18 |
||||||||||
04:
Bore a recess in the Throttle Extension Arm the size of the washer.
02/02/18 |
||||||||||
05: The New Arm
is now parallel to the stock arm. Add a new hole in the cable support bracket for alignment to the new arm. 02/02/18 |
||||||||||
06: Re-install
Bing Carburetor and hookup the Throttle and Choke Add a extra connector on the throttle cable for safety. |
||||||||||
07: Install the
Carburetor and Cabin Heat Muffs. 02/03/18 |
||||||||||
08: Cabin heat muff and cabin heat control box. | ||||||||||
09: Install Oil Separator | ||||||||||
10: Photo
when completed. 03/17/22 |
||||||||||