Vans RV Builders List
Vans Parts Joes RV 10
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Avionics Paint Interior Home
Avionics WIRING    MISCELLANEA       OPTION'S  BUILDERS LOG
 45: Power Plant
45.01 Egine Cowell 45.02 Engine Install 45.03 Engine Wiring
45.04 NACA Ducts 45.05 Ram Air Ducts 45.06 Oil Cooling
45.07 Propeller Install Engine Log Performance
  Page 45:06 Oil Cooling  
 01: Make two spacers  

03/05/18 

 02: Install the brackets that support the oil cooler as shown.

03/05/18
 03: Install oil cooler on the brackets.
Page: 45.06 Oil Cooling
45.01 Egine Cowell 45.02 Engine Install 45.03 Engine Wiring
45.04 NACA Ducts 45.05 Ram Air Ducts 45.06 Oil Cooling
45.07 Propeller Install 45.08 Engine Log 45.09 Performance
                     BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.