Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Avionics Paint / Vinyl Interior Home
Avionics WIRING    MISCELLANEA       OPTION'S  BUILDERS LOG
 45: Power Plant
45.01 Egine Cowell 45.02 Engine Install 45.03 Engine Wiring
45.04 NACA Ducts 45.05 Ram Air Ducts 45.06 Oil Cooling
45.07 Propeller Install Engine Log Performance
 Page: 45.01 Fitting the Cowell  
 01: Jabiru Engine Mount

The notch in the firewall is for the Cobra-head to the Bing carburetor.

See Alteration 08 for firewall modification.


11/28/17
 02: Install temp engine on engine mount to install the Engine Cowel

Pete form Jabiru sent me a used Engine to help with this setup.

Thanks Pete

11/28/17
 03: The Engine Cowel fit perfect without any trouble.

I removed about 1.375" from the back and it centered on the engine.

11/29/17
 04: I am happy how this looks and fits. 

This Cowel is from Jabiru USA

RV 12 firewall-forward-kits

11/29/17
 05: Add Support Angle.

11/29/17
 06: Install air filter and carb heat box.

12/18/17
 07: Remove engine mount, clean and prime.

01/14/18
 08: Two coats of paint

01/14/18
   
Page: 45.01 Fitting the Cowell
45.01 Egine Cowell 45.02 Engine Install 45.03 Engine Wiring
45.04 NACA Ducts 45.05 Ram Air Ducts 45.06 Oil Cooling
45.07 Propeller Install 45.08 Engine Log 45.09 Performance
                     BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.