|
Home | Alterations | Vendors | Builders Log | Home |
Alteration 14 Tailcone Fairing |
|
|||||||||||
Page 03: Vertical Stab & Rudder | NOTE: Any alteration will require it to be registered as Experimental-Amateur Built E-AB | |||||||||||
|
This alteration is to also add a light to the top of the vertical stab | |||||||||||
Step 01: Layout
and drill holes for Strobe Light. 04/29/18 |
||||||||||||
Step 02: Match drill
then countersink and dimple holes. 04/29/18 |
||||||||||||
Step 03: Install a
raceway for the wires of the Strobe Light. 04/29/18 |
||||||||||||
Step 04: Install a
raceway for the wires of the Strobe Light. 04/29/18 |
||||||||||||
Step 05: Cleco the
fairing to the Stabilator. 04/29/18 |
||||||||||||
Step 06: Rivet, remove
clecos as you go. 04/28/18 |
||||||||||||
Step 07: Dimple the
holes in the rudder. Builder Note: Poprivet dimple die used near the trailing edge hole. 05/02/18 |
||||||||||||
Step 08: 05/02/18 |
||||||||||||
Step 09: Rivet, remove
clecos as you go. 05/02/18 |
||||||||||||
Page 02: Fiberglass Flange |
|
|
|
||||||||||
Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source. |