Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Avionics Paint Interior Home
Home Alterations Vendors Builders Log  Home
Alteration 14 Tailcone Fairing
14.01 14.02 14.03                
Page 03: Vertical Stab & Rudder NOTE: Any alteration will require it to be registered as Experimental-Amateur Built  E-AB

This alteration is to also add a light to the top of the vertical stab
Step 01: Layout and drill holes for Strobe Light.

04/29/18
Step 02: Match drill then countersink and dimple holes.

04/29/18
Step 03: Install a raceway for the wires of the Strobe Light.

04/29/18
Step 04: Install a raceway for the wires of the Strobe Light.


04/29/18
Step 05: Cleco the fairing to the Stabilator.

04/29/18
Step 06: Rivet, remove clecos as you go.


04/28/18
Step 07: Dimple the holes in the rudder.

Builder Note: Poprivet dimple die used near the trailing edge hole.

05/02/18
Step 08:

05/02/18
Step 09: Rivet, remove clecos as you go.


05/02/18
   
Page 02: Fiberglass Flange
14.01 14.02 14.03                
Flush Rivets Stab Fairings Static Air  Canopy Lock Battery Location Wing Tanks  Rear Windows Engine Seat Adjustment
Seat Brace Brake System Electric Flaps Rudder Trim Panel       Builders Log
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.