|
Home | Alterations | Vendors | Builders Log | Home |
Alteration 17 Rear Baggage |
|
|||||||||||||||
Page 17.04 Making the Lock | NOTE: Any alteration will require it to be registered as Experimental-Amateur Built E-AB | |||||||||||||||
Parts
|
This Alteration is to add a Baggage area in the tailcone for items required to pre-flight and tie down the aircraft. It will also help with the W&B problem caused by the six cylinder Jabiru Engine |
|||||||||||||||
Step 01: Make the
lock arm 10/11/17 |
|
|||||||||||||||
Step 02: Cut off to
final length. 10/11/17 |
|
|||||||||||||||
Step 03: Make the
index stop pin 10/12/17 |
|
|||||||||||||||
Step 04: A
little mill work. File the drilled hole to a square 10/13/17 |
|
|||||||||||||||
Step: 05 This will replace the arm on the keyed lock 10/13/17 |
|
|||||||||||||||
Step 06: Make the
lock index plate as shown Install the index pin with loctite 243 10/13/17 |
||||||||||||||||
Step 07: The
finished lock parts. 10/13/17 |
||||||||||||||||
Step 08: Open 10/13/17 |
||||||||||||||||
Step 08: Locked 10/13/17 |
||||||||||||||||
Step 09: Finished baggage area in the
tailcone for items required to pre-flight and tie down the aircraft. 10/13/17 |
||||||||||||||||
Page 17.04 Making the Lock |
|
|
|
||||||||||
Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source. |