Vans RV Builders List
Vans Parts Vendors
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Home Empennage kit Wing Kit Fuselage Kit Finish Kit Power Plant Kit Avionics Paint Interior Home
Home Alterations Vendors Builders Log  Home
Alteration 17 Rear Baggage
17.01 17.02 17.03 17.04              
Page 17.02  Making the Baggage support angles. NOTE: Any alteration will require it to be registered as Experimental-Amateur Built  E-AB.
Parts
1 12"X12" .090 2024 T3
1 12"X12" .050 2024 T3
1 24"X48" .024 2024 T3
1 10" Hinge
1 Door Lock Keyed

This Alteration is to add a baggage area in the tailcone for items required to pre-flight and tie down the aircraft.

It will also help with the W&B problem caused by the six cylinder Jabiru Engine.

Step 01: Make the bottom center/aft support angle.

09/17/17
 
Step 02: Make the bottom front support angle.

09/17/17
 
Step 03: Make the top support angle.  
Step 04: Make the forward vertical support angle.

09/18/17
 
Step 05: Make the rear vertical support angle.  
Step 06: Install the bottom center/aft , bottom front , top support angles.

09/17/17
 
Step 07: Install front and rear vertical support angles.

10/13/17
   
Page 17.02  Making the Baggage support angles.
17.01 17.02 17.03 17.04              
Flush Rivets Stab Fairings Static Air  Canopy Lock Battery Location Wing Tanks  Rear Windows Engine Seat Adjustment
Seat Brace Brake System Electric Flaps Rudder Trim Panel       Builders Log
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.