Alteration 17 Rear Baggage |
|
Page 17.01 Making the Door |
NOTE: Any
alteration will require it to be registered as Experimental-Amateur
Built E-AB. |
Parts
1 |
12"X12" .090 |
2024 T3 |
1 |
12"X12" .050 |
2024 T3 |
1 |
24"X48" .024 |
2024 T3 |
1 |
10" |
Hinge |
1 |
Door Lock |
Keyed |
|
This Alteration is to add a baggage area in
the tailcone for items required to pre-flight and tie down the aircraft.
It will also help with the W&B problem caused
by the six cylinder Jabiru Engine
|
Step 01: Make the
door frame from .090 2024 T3. Mill a .028 relief in the frame for a
.049 thick door. Then counter sink for CS4-4 Rivets.
09/16/17 |
|
Step 02: Make the
Hinge Support Angle then clean, scuff, prime and install nut plates for
the hinge. |
|
Step 03: Make the
door and hinge.
09/16/17 |
|
Step 04: Layout
then match drill.
09/16/17 |
|
|
|
Page 17.01 Making the Door |
|