Step 01: Secure the WD-1210 Control Column to the Control Column Mount Assemblies using the hardware called out in Figure 1. Hardware call-outs are symmetrical about the fuselage centerline. Small tabs of tape can be used to hold the pairs of washers during installation.

08/21/12

Builder Note: Tool for installing washers
Step 02: Dimple the holes in the top flange of both inboard F-1212-L & R Step Ribs indicated in Figure 2.  
Step 03: Dimple the six sets of nutplate attach rivet holes in the top flange of the F-1202F Bulkhead.

08/21/12
Step 04: Rivet the F-1212-L & R Step Ribs to the F-1203A Bulkhead using the rivets called out in Figure 2.

08/21/12
Step 05: As indicated in Figure 2, dimple the bottom hole in the forward flange of both outboard F-1212-L & R Step Ribs and the two corresponding holes in the F-1202F Bulkhead.  
Step 06: Cleco ( DO NOT RVET ) the F-1202 F Bulkhead to the the F-1212-L & R Step Ribs as shown in Figure 2.

Builder Note: Clecos are on back side
Step 07: Figure 3 shows a bottom view of the fuselage. Install the snap bushings that are called out  into the holes of the bulkhead as shown.  
   
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.