Step 01: Remove the F1202F Bulkhead and the F-1236A-L & B Step Attach Angles from the fuselage. ( Keep the step attach angles clecoed to the bulkhead. ) Use the bolts shown in Figure 1 to secure the F-1251-L Nutplate Brackets to the step attach angles and bulkhead. | |||||||||||||||||||||||
Step 02: Align the F1251 Nutplate Brackets vertically on the F-1236A-L & B-L Step Attach Angles, then match-drill #30 the two holes of the F1202F Bulkhead and step attach angles into the nutplate brackets as shown in Figure 1. | |||||||||||||||||||||||
Step 03: Deburr the holes in the F-1202F Bulkhead, the F-1236A-L & B-L Step attach angles, the F1251-L Nutplate Brackets, and the F-1212-L & R Step Ribs. | |||||||||||||||||||||||
Step 04: Prime the F-1236A-L & B-L
Step Attach Angles. 09/11/12 |
|||||||||||||||||||||||
Step 05: Rivet the F1236A-L & B-L
Step Attach Angles to the F-1212-L & R Step Ribs using the rivets called
out in figure 2. 09/12/12 Builder Note: |
|||||||||||||||||||||||
Step 06: Repeat Steps 1-5 for the
right side of the fuselage. 09/12/12 Builder Note: |
|||||||||||||||||||||||
Step 07: Cleco the F-1202F Bulkhead
back in place, then rivet it to the F-1212-L & R Step Ribs using the
rivets called out in Figure 3. 09/12/12 Builder Note: Hold on the rivets in the center two ribs for Engine Altreration. |
|||||||||||||||||||||||
Step 08: Rivet the F-1251-L Nutplate Brackets and the F-1236A-L & B-L Step Attach Angles to the F-1202F Bulkhead using the rivets called out in figure 4. Repeat for the right side of the fuselage. | |||||||||||||||||||||||
Step 09: Rivet the F1202F Bulkhead to the F1274-L Fuselage Corner Skin using the rivets called out in Figure 4. Do Not Rivet the bulkhead to the F-1276 Bottom Skin. Repeat for the right side of the fuselage. | |||||||||||||||||||||||
Step 10: The WD-1233-L & R Steps can be installed at any time during the building process using the hardware called out in Figure 4. | |||||||||||||||||||||||
Step 11: Dimple the nutplates shown in Figure 5, then rivet them to the top flange of the F-1202F Bulkhead using the rivets called out. Do Not Attach nutplates at the indicated hole locations. | |||||||||||||||||||||||
Step 12: Install the snap bushings called out in Figure 5 into the holes indicated. | |||||||||||||||||||||||
|
||||||||